Border Environment Cooperation Commission

Wastewater Collection System Rehabilitation and Improvements Project

Tijuana, Baja California

 

General Criteria

Human Health and Environment

Technical Feasibility

Financial Feasibility

Public Participation

Sustainable Development

 

 

 

General Criteria

1.        Project Type

 

The project consists of the rehabilitation of approximately 131,000 meters of wastewater collection lines, which represents approximately 7.5% of the total length of the city’s system.

 

 


 

2.     Project Location

 

The project is located in the city of Tijuana in the state of Baja California.  All the components of the project are located within the watershed of the Tijuana River, which flows into the United States and reaches the Pacific Ocean through the Tijuana Estuary.  According to the 2000 Census, Tijuana has a population of 1,210,820.   The Consejo Estatal de Población (CONEPO) has official population projections through the year 2010.  It is expected that Tijuana will reach a population of 1,424,426 by that year.  If the population growth rate of 2.1% per year utilized by CONEPO for the period 2005-2010 is extrapolated for the next decade, a population projection of 1,755,138 for the year 2020 is obtained.

 

 

3.    Project Description and Tasks.

 

The proposed project is composed of 50 specific projects for the rehabilitation of sewer laterals, collectors and sub-collectors.  Overall, 131,000 meters of sewer lines will be rehabilitated with lines varying in diameter from 20 to 122 cm. Of the 50 projects, 36 involve the rehabilitation of laterals, 7 the rehabilitation of collectors, 6 the rehabilitation of sub-collectors, and 1 the rehabilitation of an interceptor.

 

The following table summarizes all 50 proposed projects.

 

NUMBER

NAME

 BENEFITED POPULATION (RESIDENTS)

DIAMETER           (cm)

PARCIAL  LENGTH (m)

TOTAL  LENGTH (m)

AGE (YEARS)

1

Sub-colector Rampa Buena Vista

         11,089

30

1310

1310

32

2

Colector Central

-

38

941

1898

32

61

957

3

Laterals in  Zona Este

           6,024

20

609

760

30

30

81

38

70

4

Lateral in Zona Rio Oriente

           1,380

20

540

597

23

25

32

30

26

5

Subcolector cjón. Serv. 2da. Oriente, Ciudad Industrial

           1,500

30

682